Call Us: (800) 419-4923
 Call Us: +44 (0)20 3865 7701
 Call Us: (787) 822-8377
 Call Us: (437) 855-4925
Partner Engineering and Science, Inc.
You are here: Home » Resources » References » Standards & Regulations » Page 2

Search results for:

FEMA Form 81-93: Standard Flood Hazard Determination Form (SFHDF)

The Department of Homeland Security (DHS) and FEMA’s Form 81-93: Standard Flood Hazard Determination Form (SFHDF). Includes instructions for completion. [ Download Here ]

USDA Rural Development Form 1940-20: Request for Environmental Information

USDA Rural Development Form 1940-20: Request for Environmental Information. Includes instructions for preparing form. [ Download Here ]

EPA Subsurface Vapor Intrusion Guidance

The U.S. Environmental Protection Agency’s (EPA) OSWER Draft Guidance for Evaluating the Vapor Intrusion to Indoor Air Pathway from Groundwater and Soils (Surface Vapor Intrusion Guidance), November 2002. [ Download […]

Bona fide Purchaser CERCLA Defense Trial

From The United States District Court Central District of California, details on the Bona fide Purchaser CERCLA Defense Trial, March 2010. [ Download Here ]

ALTA ACSM Land Title Survey Standard 2011

Minimum standard detail requirements for all ALTA/ACSM Land Title Surveys (Effective February 23, 2011). [ Download Here ]

2016 ALTA/NSPS Land Title Survey Standards

2016 Minimum Standard Detail Requirements for ALTA/ NSPS Land Title Surveys are the next version of the former Minimum Standard Detail Requirements for ALTA/ACSM Land Title Surveys.

HUD Multifamily Accelerated Processing Guide

The U.S. Department of Housing and Urban Development (HUD) released this update to its Multifamily Accelerated Process Guide in January 2016. It is effective as of May 28th, 2016. Specifically, […]

California Seismic Ordinances

Partner can assist you in navigating the complexities of California’s Seismic Ordinances, with a comprehensive seismic retrofit consultation through structural property inspections and forensics to structural design, strengthening and rehabilitation.

SBA SOP 50 10 8 Environmental Flowchart

Partner’s Steps of Environmental Investigation according to the new SOP 50 10 8 with Technical Updates (effective on June 1, 2025). [ Download NEW Flowchart Here ]

Let us be your Partner

Learn how we can support your next project or share insights via our newsletter.
Terms and Conditions  |  Privacy Policy   |  Website Terms of Use  |  © 2026 Partner ESI. All rights reserved.
crossmenuarrow-up linkedin facebook pinterest youtube rss twitter instagram facebook-blank rss-blank linkedin-blank pinterest youtube twitter instagram