Call Us: (800) 419-4923
Partner Engineering and Science, Inc.
Partner Engineering and Science, Inc.
You are here: Home » Projects » Phase I Environmental Site Assessment – Louisiana

Phase I Environmental Site Assessment – Louisiana

Partner completed a Phase I Environmental Site Assessment (ESA) at a former Louisiana Coca-Cola Bottling Co. in April of 2020. The facility is approximately 233,000 square feet on 5.6 acres of land. Partner’s Phase I ESA was accompanied by a HUD Part 50 Environmental Assessment. Recognized Environmental Conditions were identified during the Phase I ESA in connection with historical on-site underground storage tanks (USTs). A Historical REC (HREC) was also identified in connection with former on-site automotive repair including in-ground hydraulic lifts. As a result of these findings, a Tier Vapor encroachment Screening (VES) was order from the client. Based on the findings of the ESA and the VES, Partner recommended conducting a Phase II.

The building is constructed with a partially flooded basement. These conditions made subsurface drilling during the Phase II especially difficult. Partner was able to employ innovative sampling techniques to complete the scope of work.

Need to Know

Project Location
New Orleans, Louisiana
Project Sector
Industrial
Start Date
April 17, 2020
Client
Confidential

Let us be your Partner

Learn how we can support your next project or share insights via our newsletter.
Partner is the leading provider of engineering, environmental, construction, energy, and valuation consulting for the commercial real estate industry. We help our clients manage risk, make smart investments, optimize asset performance, and win at their real estate investment strategies.
Our Family of Companies
Terms and Conditions  |  Privacy Policy   |  Website Terms of Use  |  © 2023 Partner ESI. All rights reserved.
crossmenuarrow-up linkedin facebook pinterest youtube rss twitter instagram facebook-blank rss-blank linkedin-blank pinterest youtube twitter instagram