Call Us: (800) 419-4923
 Call Us: +44 (0)20 3865 7701
 Call Us: (787) 822-8377
 Call Us: (437) 855-4925
Partner Engineering and Science, Inc.
Partner Engineering and Science, Inc.
You are here: Home » Projects » Multi-Scope Due Diligence and Green Reports for Multifamily Portfolio – Greater Columbus, OH

Multi-Scope Due Diligence and Green Reports for Multifamily Portfolio – Greater Columbus, OH

To meet the needs of multiple investors, Partner completed Phase I Environmental Site Assessments, Radon Testing, Property Condition Assessments and Freddie Green Reports according to both Fannie Mae and Freddie Mac guidelines for six apartment complexes throughout Ohio, within a 30-day time frame.

As part of the Freddie Green Report and Fannie Mae site visits, Partner Energy visited each of the properties to ensure the multi-family units met the Fannie Mae High Performance Building Assessment scope and the Freddie Mac Green Advantage Green Up scope while also assessing for energy and water efficiency throughout each of the properties.

While Freddie Mac guidelines were followed, Partner also completed radon testing on 100% of all units per Ohio’s stringent requirements, and completed follow-up testing 2 months later since elevated levels in several of the properties were found.

In addition to the follow up radon testing, Partner also made recommendations for mitigation on properties that had radon levels above the EPA action limit and provided Operations and Maintenance (O&M) programs for suspected ACM and LBP.

Project Leads

Let us be your Partner

Learn how we can support your next project or share insights via our newsletter.
Terms and Conditions  |  Privacy Policy   |  Website Terms of Use  |  © 2025 Partner ESI. All rights reserved.
crossmenuarrow-upchevron-right-circle linkedin facebook pinterest youtube rss twitter instagram facebook-blank rss-blank linkedin-blank pinterest youtube twitter instagram